Exporting Kırşehir Granite from Turkey requires more than booking a container. The packing method, piece orientation, moisture protection, crate/bundle design, labeling and loading sequence should match the product format and journey.
Plan quantity with the installation in mind
Confirm net project quantity, reasonable spare allowance and whether replacement pieces must come from the same production lot. For directional or bookmatched material, spare planning should consider visual matching rather than square meters alone.
Choose packing for the product
- Slabs: secure bundles or suitable frames with separation/protection.
- Tiles and cut-to-size: reinforced crates or pallets with controlled piece movement.
- Steps/panels: sequencing and edge protection to reduce handling damage.
- Porous or moisture-sensitive materials: review ventilation/protection for the route.
Label for the site
Piece codes, crate numbers, quantities and drawing references make receiving and installation easier. A packing list should correspond to physical labels, especially on phased projects.
Commercial and shipping terms
Define the Incoterm, named port/place, included export documents and responsibility for freight, insurance and destination charges. Production lead time and sailing time should be treated separately in the schedule.